keskiviikko, 30. syyskuu 2026

OVERHEAD TRANSFORMER CONNECTIONS

 

OVERHEAD TRANSFORMER CONNECTIONS

1. The distance between the wire of distributing line and pole or framework: at least 0.3m per 10kV and 0.1m per 0.4kV.

 

2. The net distance between lead wire, downlead in each phase and the lead wire or downlead of next phase: at least 0.3m per 10kV and 0.1m per 0.4kV.

 

3. The lapping zone of distributing line's downlead and overhead insulated line should be connected in T type clamp or insulating parallel groove and covered in insulating materials. Besides, use waterproof tape and self-adhesive insulating tape, corresponding to the voltage classes, in the joint of insulating wine and insulating cover, so that it can be waterproofed and dust-free.

 

4. The ground downlead should connect with the middle points of low voltage sides and the corresponding shells. After that, earth it again with the ground resistance below 10 ohm. In case the needs can not be met, you need to add the length of vertical and horizontal grounding objects.

 

5. The mounting height of pole distribution transformers and switch boxes should not lower than 3m.

 

6. Under the premise of satisfying the requirement of phase, the drop-out fuse should be installed on the highway side.

 

7. Before installing equipment, the mounting hole size should be checked carefully. If it doesn't match the installation drawing, you should contact with the design unit in time to let the problem properly solved.

 

Reach out to overhead distributon transformer, one of the overhead transformers manufacturers in China, for a pricing inquiry today.

 

As a trustworthy and reliable transformer manufacturer in china, we provide you with step down transformer.

3.jpg

keskiviikko, 30. syyskuu 2026

OVERVIEW OF VARIOUS CLASSIFICATIONS OF 10KV TRANSFORMERS

 

1. TRANSFORMER OVERVIEW

The 10 kv transformer is referred to as "distribution". It refers to a kind of static electric appliance in the distribution system that converts AC voltage and current according to the law of electromagnetic induction and transmits AC electric energy. A 10kV transformer is usually a power transformer that operates in the distribution network with a voltage rating of 10-35kV (mostly 10kV and below) and a capacity of 6300KVA and below directly to the end user.

 

2. SORTED BY INSTALLATION LOCATION

The transformer 10kv is divided into indoor and outdoor depending on the installation location. Outdoor installation is divided into platform type, tower type and floor type (including pre-installed type).

 

2.1 pole tower

The tower type is a structure in which a transformer is mounted on a pole. It is divided into single pole and double pole.When the 10kV transformer capacity is 30KVA or less (including 30KVA), a single pole 10kV transformer gantry is generally used. Install a 10kV transformer, high-voltage drop fuse and high-voltage arrester on a cement rod. The shaft should be tilted 13°-15° in the opposite direction of the assembled 10kV transformer.

 

When the 10kV transformer capacity is between 50KVA and 315KVA, a double-pole 10kV transformer station is generally used. The 10kV transformer stage consists of a main rod cement rod and another auxiliary rod. The main pole is equipped with a high voltage drop fuse and a high voltage down conductor, and the secondary pole has a secondary reverse lead. The double pole 10kV transformer stage is sturdy with a single pole 10kV transformer.

 

The advantages of the tower type installation: the land occupation is small, the surrounding wall does not need to be fenced or covered, and the charged part is higher than the ground, which is not easy to cause accidents.

Disadvantages: The rack needs more steel and the cost is higher.

 

2.2 Pier type

The pier type is a square pier with 0.5-1 m masonry under the transformer pole, and the transformer is placed on it. Generally, a transformer of 315KVA or more is installed.

 

Pay attention to the following three points when installing a pier type transformer:

 

(1) A solid barrier or masonry wall of not less than 1.8m shall be installed around the transformer. The door shall be locked and kept by a special person.

(2) The barrier and fence should have sufficient safe operating distance from the transformer.

(3) Warning signs such as "high-pressure danger, no climbing" should be hung on poles or fences to prevent people and animals from approaching.

 

Advantages of the pier type installation: it is low in cost and easy to maintain and repair.

Disadvantages: It occupies a large area, and it is necessary to install a fence around it. Small animals are easy to climb to the charged part, which is prone to damage caused by external forces.

 

2.3 Floor type

Floor-standing means that the transformer is placed directly on the ground, and the high-voltage down-conductor, the drop-out fuse and the arrester are all on the line terminal rod. Pay attention to the following three points when installing a floor-standing transformer:

(1) A reliable fence must be installed around the transformer. The door should be locked and kept by a specific person.

(2) Warning signs such as "high voltage danger, no climbing" shall be hanged outside the fence.

(3) Since the live part of the transformer is very low from the ground, the person must enter the barrier after cutting off the power.

 

3. CLASSIFIED BY COOLING METHOD

According to the cooling method, it can be divided into oil-immersed and dry-type transformers.

Oil-immersed transformers rely on oil as a cooling medium, such as oil-immersed self-cooling, oil-infiltrated air-cooled, oil-immersed water-cooled, forced oil circulation, and the like. Dry-type transformers rely on air convection for natural cooling or increased fan cooling. They are used in small-capacity transformers such as high-rise buildings, high-speed toll stations, and local lighting and electronic circuits.

 

3.1 Oil-immersed transformers are divided into:

1) Non-closed oil-immersed transformer: It mainly has S8, S9, S10 and other series products, which are widely used in industrial and mining enterprises, agriculture and civil buildings.

2) Closed-type oil-immersed transformer: It mainly has S9, S9-M, S10-M and other series of products, which are mostly used in places with multiple oil and chemical substances in petroleum and chemical industries.

3) Sealed oil-immersed transformer: It mainly has BS9, S9-, S10-, S11-MR, SH, SH12-M and other series products, which can be used for power distribution in industrial and mining enterprises, agriculture, civil buildings and other places.

 

3.2 Dry type transformers are divided into:

1) Encapsulated coil type dry-type transformer: It mainly has SCB8, SC(B)9, SC(B)10, SCR-10 and other series products, suitable for high-rise buildings, commercial centers, airports, stations, subways, hospitals, factory and other places

2) Non-encapsulated coil dry-type transformer: It mainly has SG10 series products, suitable for high-rise buildings, commercial centers, airports, stations, subways, petrochemicals and other places.

 

4. ELECTRIC VOLTAGE REGULATION

According to the voltage regulation method, it can be divided into on-load voltage regulation and no-load voltage regulation.The so-called no-load voltage regulation and on-load voltage regulation all refer to the transformer tap changer voltage regulation mode. The difference is that the unloaded regulator switch does not have the ability to load shift gears, and the transformer must be powered off when shifting. The on-load tap-changer can be switched with load.

 

5. PHASE NUMBER CLASSIFICATION

According to the number of phases, it is divided into single-phase transformer and three-phase transformer.A single-phase transformer is a transformer in which the primary winding and the secondary winding are single-phase windings. The single-phase transformer has a simple structure, small volume and low loss, and is mainly small in iron loss, and is suitable for application and promotion in a low-voltage distribution network with a small load density.

 

Three-phase transformers are used for the rise and fall voltages of three-phase systems. For a three-phase transformer, there are generally three primary windings, which are divided into triangles and stars, and extended triangles. The voltages on the three windings are 120 degrees out of phase, which is the common three-phase 380 volt connection. The core of the iron core is a three-phase three-core column, a three-phase five-core column, and an involute shape.YueBian Electric Co.,Ltd is a professional 10kv oil transformer supplier. Welcome to purchase.

 

For more information about 10kv outdoor transformer substation and classification of single phase transformer, please feel free to contact us!

 

As a trustworthy and reliable china transformer manufacturer, we provide you with power transformer.

4.jpg

keskiviikko, 30. syyskuu 2026

OPERATION AND MAINTENANCE OF BOX SUBSTATION

Ⅰ. BASIC REQUIREMENTS FOR box type substation OPERATION

 

1. Box type equipment should be placed in a relatively high place, but not in a low-lying place, lest rainwater enters the electrical substation box and affects its operation. Leave a gap when pouring the concrete platform to facilitate the laying of cables.

 

2. There must be two reliable connections between the box and the grounding grid. When the box-type substation is working, the ground wire and the neutral wire can share a grounding grid. The grounding grid is generally grounded at the four corners of the foundation and then connected to form a whole.

 

3. No illegal piles of materials are allowed around the box-type equipment to ensure the ventilation of electrical equipment and the operation and inspection needs. The box types of transformer substation is mainly cooled by natural air circulation, and the transformer room door should not be blocked.

 

4. Equipment in the high-voltage China box substation transformer devices such as loop network switches, transformers, and lightning arresters should be inspected and maintained regularly. If defects are found, they should be repaired in time, and preventive insulation tests should be conducted periodically. When working, the mechanical interlock should be correctly released, and the insulating rod should be used for the operation.

 

 

Ⅱ. INSPECTION AND MAINTENANCE OF box substation

 

According to the patrol maintenance cycle, box transformer 10kv substation should be patrolled regularly (not less than once a month) to test the temperature of the cable terminal connection, check the equipment operation, and conduct tests when necessary.

 

For more information about transformer substation maintenance, please feel free to contact us!

 

As a trustworthy and reliable power transformer supplier, we provide you with step down transformer.

2.jpg

 

keskiviikko, 30. syyskuu 2026

ON LOAD TRANSFORMER

 

ON load transformer

The transformer has impedance and will produce voltage drop during power transmission, which will change with the change of user side load. The fluctuation of system voltage plus the change of user side load will cause the great variation of voltage. On the premise of achieving local balance of reactive power, when the voltage changes beyond a fixed value, the on load transformer will operate after a certain delay to adjust the voltage and keep the voltage stable.

 

The task of the power supply transformer is to supply power directly to the load center, and the primary side is directly connected to the main voltage network (220 kV and above) or to the regional power supply network (35 ~ 110 kV). Such transformers not only provide power to the load, but also often provide reactive power, and generally have a large short circuit impedance.

 

As the regional load changes, the supply busbar voltage will change if an on load transformer is not configured. Therefore, China's "technical guidelines for power systems (trial)" provisions "for 110 kV and below the transformer, it is appropriate to consider at least one level of voltage transformer with load regulation mode.

 

Therefore, on the premise of achieving the local balance of reactive power division, the on load transformers that directly supply power to the power supply center can be adjusted with the switching of shunt capacitors and low-voltage reactors of reactive power compensation equipment as the regional load increases and decreases, so as to ensure the quality of power supply voltage to users at any time.

 

As a trustworthy and reliable transformer supplier, we provide you with distribution transformer.